26.2.2014
Finished
See other blog post "Conservatory details"
14.2.2015
Re painting outside walls at conservatory entrances
Farrow and Ball "India yellow"
Floorboards cleaned and ready for sanding
11.2.2015
10.2.2015
Floor board delivery
7.2.2015
Start of recycled floorboards
Insulation
6.2.2015
Wood staining (stockholm tar, boiled linseed oil, pure turpentine 1:4:4 )
5.2.2015

3.2.2015
Undercoat, ready for Farrow and Ball "String"
30.1.2015
Recycled floorboards from a Jute mill in Dundee
(nails being removed)
23.1.2015
Lights
Pipes connected, logs burning...smoke

Stove and hearth preparation
Recycled barn door handles
12.1.2015
Some recycled doors being used
and guttering
1st side window
More recycled pine beams
for side and doorway
Interlocking plastic roofing
22.12.2014
Larch Rafters
5.12.2014
3.12.2014
ordered up
Delivered
1.12.2014
Forth valley concrete - mix in vehicle as required
28.11.2014
Go
Mike Taylor Building Services
Ready for base
Ready..

Before
Repurposed windows stored ready
Found in woodpile
of ash, elm and oak:-
Pine blocks for conservatory